Facility
Summer Works: Temporary Unavailability of Workspaces in Lipsius and Huizinga Buildings
This summer, the main power distribution cabinet– the installation that distributes electricity throughout the Lipsius building and the Huizinga – will be replaced. As a result, parts of the Lipsius and Huizinga buildings will be without power on several days and it will not be possible to work there. The Huizinga Building will be unavailable as a workspace on 28 July. The Lipsius Building cannot be used as a workspace on 4 and 5 August.
Do you need an alternative workspace on any of these days? Please email huisvesting@hum.leidenuniv.nl, so we can help you find a suitable alternative.